Overview

As part of major upgrades to the facilities at the All-England Club, we were appointed to install a new gas service and U65 meter.

Key Factors

Timescales: Our installation had to be carried out within a very defined timeframe due to the requirement to complete the facilities upgrades in time for the next Wimbledon tennis championships.

Locality: The All-England Club is in a densely populated urban area presenting challenges with excavations that were required in front of residential properties. The connection to the existing network was within the far-side carriageway adding complexity to the control of traffic in the local area.

Outcome

All required timeframes were met and disruption to the local residents was minimised through meticulous planning and site management.